A bulk fueling facility contacted Clear Creek to assist with their stormwater discharges.  The staff maintained a good BMP schedule and kept their site clean, but still had issues with elevated metals in their runoff.  The facility was targeted by a citizen suit under the Clean Water Act, and had to fast track their solution to meet their consent decree.

The facility reached out to Clear Creek for a fast response.  Clear Creek worked with their facility and an outside engineering firm to upgrade their infrastructure and provide a treatment solution with 120 days.  Bench testing showed that simple mechanical filtration followed by a polishing adsorptive media lowered all pollutants to non-detect ranges, and a system was designed around this treatment train.  Clear Creek trained the facility personnel to conduct routine system maintenance.

 

Services Provided

  • Laboratory Treatability Testing
  • Permitting Assistance
  • Fast Track Design and Mobilization
  • System Design / Build
  • System Maintenance & Monitoring

Technology Provided

  • Mechanical Filtration
  • Polishing Adsorptive Media
  • System Automation
  • 50 gallons-per-minute

Project Statistics

  • 1.2 – Acre Site
  • Discharge to Marine Waters
  • Target Pollutants: Turbidity, Cu & Zn
  • Commissioned in 2016